Amount Funded |
|
|
|
|
|
|
|
|
|
|
|
|
323 |
21/7/08 |
Energy Users Association of Australia |
AER review of WACC for transmission and distribution networks |
Rejected |
|
321 |
25/6/08 |
Major Energy Users Inc (ECCSA) |
Respond to ElectraNet appeal to Australian Competition Tribunal over AER's decision of 2008 |
Approved |
$27,952.00 |
320 |
23/6/08 |
Consumer Action Law Centre |
Costs for Roundtable participants attending MCE forums on National Energy Customer Framework |
Approved |
$5,000.00 |
319 |
20/6/08 |
Major Energy Users Inc (EMRF, ECCSA, EUCV) |
AER review of WACC for transmission and distribution networks |
Approved |
$39,504.00 |
318 |
10/6/08 |
Energy Users Association of Australia |
Transgrid revenue cap application 2009/10-2014/15 |
Approved |
$39,000.00 |
317 |
10/6/08 |
Energy Users Association of Australia |
Transend revenue cap application 2009/10-2014/15 |
Approved |
$31,000.00 |
316 |
10/6/08 |
Energy Users Association of Australia |
NSW and ACT Electricity distribution price reviews 2009/10-2014/15 |
Rejected |
|
315 |
29/5/08 |
Australian Council of Social Service |
Travel costs for consumer representatives on the National Smart Meter Working Groups 2008/9 |
Approved |
$35,991.00 |
314 |
26/5/08 |
Energy Users Association of Australia |
Whether to and how to response to the AER’s Rule Change Requests in relation to the WACC |
Rejected |
|
313 |
27/5/08 |
Energy Users Association of Australia |
Transgrid Western 500 KV network support pass-through |
Withdrawn |
|
312 |
9/5/08 |
Energy Users Association of Australia |
Cost, reliability and other impacts of an expanded MRET of 20% on end-users in the NEM |
Deferred |
|
311 |
9/5/08 |
Energy Users Association of Australia |
Generator price and availability monitoring |
Approved |
$5,000.00 |
310 |
6/5/08 |
Australian Council of Social Service |
Travel costs for consumer representatives on the National Smart Meter Working Groups May/June 2008 |
Approved |
$2,200.00 |
309 |
1/5/08 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Distribution price cap review for NSW businesses |
Deferred |
|
308 |
1/5/08 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Transgrid revenue cap review 2008 |
Deferred |
|
307 |
26/3/08 |
UnitingCare Wesley Adelaide |
Review of effectiveness of energy competition in South Australia |
Approved |
$37,500.00 |
306 |
27/3/08 |
Tasmanian Council of Social Service |
NEM advocacy 2008-9 |
Approved |
$36,934.00 |
305 |
28/3/08 |
Energy Users Association of Australia |
Impacts of an emissions trading scheme on the NEM |
Deferred |
|
304 |
24/3/08 |
Energy Users Association of Australia |
NEM advocacy 2008-9 |
Approved |
$146,538.00 |
303 |
13/3/08 |
Total Environment Centre |
NEM advocacy 2008-9 |
Approved |
$73,660.00 |
302 |
13/3/08 |
Alternative Technology Association |
Advocacy for renewable energy micro-generation in the NEM 2008-9 |
Approved |
$52,564.00 |
301 |
13/3/08 |
Griffith University Centre for Credit and Consumer Law |
Advocacy and research for Queensland small end-users 2008-2009 |
Approved |
$127,440.00 |
300 |
13/3/08 |
Australian Council of Social Service |
NEM advocate 2008-9 |
Approved |
$113,673.00 |
299 |
13/3/08 |
Consumer Action Law Centre |
NEM Network coordinator and researcher and Roundtable meetings |
Approved |
$146,148.00 |
297 |
27/3/08 |
Ethnic Communities Council of New South Wales |
Education and advocacy for ethnic communities |
Rejected |
|
296 |
27/3/08 |
Public Interest Advocacy Centre |
NEM advocate for 2008/9 |
Rejected |
|
295 |
13/2/08 |
Queensland Consumers Association |
Queensland Competition Authority's Draft Decision on calculation of the Electricity Benchmark Retail Cost Index for 2008/9 |
Approved |
$3,600.00 |
294 |
5/2/08 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
AER review of price spikes in South Australia in January 2008 |
Approved |
$19,152.00 |
293 |
27/2/08 |
Australian Council of Social Service |
Online resources for energy market advocacy |
Rejected |
|
292 |
27/2/08 |
Australian Council of Social Service |
Professional development for consumer advocates - climate change, energy efficiency and emissions trading |
Approved |
Added to Applic 249 |
291 |
17/12/07 |
Australian Council of Social Service |
National Energy Consumers Conference August 2008 |
Rejected |
|
290 |
3/12/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
AER review of guidelines for distribution and service target performance |
Approved |
$20,160.00 |
289 |
28/11/07 |
Energy Users Association of Australia |
AEMC review of demand side participation in the NEM |
Approved |
$51,000.00 |
288 |
28/11/07 |
Ethnic Communities Council of New South Wales |
NEM advocacy and capacity building to represent ethnic communities |
Rejected |
|
287 |
23/11/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Review of guidelines for the NSW distribution transitional review by the AER |
Approved |
$11,088.00 |
286 |
13/11/07 |
Consumer Utilities Advocacy Centre |
Distributed generation : testing the impact of recommended regulation and Rule change |
Approved |
$24,773.00 |
| 285
|
4/10/07 |
Energy Users Association of Australia |
WACC Parameters Rule change |
Approved |
$35,300.00 |
284 |
5/10/07 |
Energy Users Association of Australia |
Research a competitive market structure for retail and generation in New South Wales |
Rejected |
|
283 |
3/10/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
AEMC congestion management - respond to draft decision |
Rejected |
|
282 |
18/9/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
SCO Issues Paper on the proposed structure of the Australian Energy Market Operator |
Approved |
$8,400.00 |
281 |
4/9/07 |
Energy Action Group |
Residential energy consumers capacity building program |
Rejected |
|
280 |
6/9/07 |
Total Environment Centre |
Price or Revenue Caps - which better encourages more efficient use of electricity in the long term interests of electricity consumers |
Approved |
$42,500.00 |
279 |
6/9/07 |
Total Environment Centre |
Capacity and cost-effectiveness of demand management in the NEM |
Deferred |
|
278 |
9/8/07 |
Energy Users Association of Australia |
Implications for end-users of the increasing concentration and vertical integration of the NEM |
Deferred |
|
277 |
9/8/07 |
Energy Users Association of Australia |
National distribution network connection and planning review |
Approved |
$23,000.00 |
276 |
9/8/07 |
Energy Users Association of Australia |
National transmission planner review by AEMC |
Approved |
$28,000.00 |
275 |
8/8/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
National transmission planner review by AEMC |
Rejected |
|
274 |
8/8/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
National distribution network connection and planning review |
Rejected |
|
273 |
8/8/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
AER Guidelines for Regulatory Test version 3 |
Approved |
$14,112.00 |
272 |
6/7/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Reliability Panel's 2nd Interim report |
Approved |
$23,900.00 |
271 |
4/7/07 |
Consumer Utilities Advocacy Centre |
Expert forum on electricity pricing |
Rejected |
|
270 |
6/7/07 |
Consumer Action Law Centre |
Consumers' experiences of energy marketing - a case study report |
Approved |
$22,500.00 |
269 |
4/7/07 |
Consumer Utilities Advocacy Centre |
Distributed generation: Removing the barriers to efficient network investments made by consumers |
Deferred |
|
268 |
4/7/07 |
Energy Action Group |
Standing offer/price caps |
Rejected |
|
267 |
4/7/07 |
Energy Users Association of Australia |
The underlying cost drivers of generation in the NEM |
Rejected |
|
266 |
4/7/07 |
Energy Users Association of Australia |
Technical assessment of AER review of transmission service standards |
Approved |
$46,500.00 |
265 |
4/7/07 |
Energy Users Association of Australia |
Technical advice on NEMMCO, Victorian Government and AER reports on January 2007 blackouts |
Rejected |
|
264 |
4/7/07 |
Energy Users Association of Australia |
The future for gas-fired generation and impacts on energy users |
Approved |
$50,000.00 |
263 |
6/6/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Submission to Owen Inquiry into Electricity Supply in NSW |
Approved |
$25,968.00 |
262 |
23/5/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Revenue determination for Electra Net 2008/2013 |
Approved |
$38,288.00 |
261 |
17/5/07 |
Energy Users Association of Australia |
Investigation of high prices in the NEM - causes, consequences and responses |
Approved |
$34,960.00 |
260 |
10/5/07 |
Energy Users Association of Australia |
Additional funding for project 116 |
Approved |
$9,712.00 |
259 |
9/5/07 |
Consumer Utilities Advocacy Centre |
Airfares for National Consumer Roundtable to meet with RPWG on composite paper |
Approved |
$6,320.00 |
258 |
27/4/07 |
Energy Users Association of Australia and Energy Action Group |
EMR Bulletin 84 - National Electricity Rules - Distribution revenue and pricing |
Approved |
$20,960.00 |
257 |
27/4/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
EMR Bulletin 84 - National Electricity Rules - Distribution revenue and pricing |
Approved |
$20,960.00 |
256 |
5/4/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
AER Pricing Methodology Guidelines for Electricity Transmission Pricing |
Approved |
$22,976.00 |
255 |
26/3/07 |
Energy Users Association of Australia |
Revenue determination for Electra net 2008/2013 |
Rejected |
|
254 |
23/3/07 |
Australian Council of Social Service |
NEM advocate for 2007/08 |
Approved |
$121,770.00 |
253 |
21/3/07 |
Energy Action Group |
Residential energy consumers capacity building program 2007/08 |
Rejected |
|
252 |
22/3/07 |
Energy Users Association of Australia |
Re-funding of staff advocacy position for 2007/08 |
Approved |
$136,828.00 |
251 |
20/3/07 |
Griffith University Centre for Credit and Consumer Law |
Advocacy and research for Queensland small end-users 2007/08 |
Approved |
$138,678.00 |
250 |
20/3/07 |
South Australian Council of Social Service |
NEM Advocacy Resource Project 2007/08 |
Approved |
$25,896.00 |
249 |
20/3/07 |
Consumer Action Law Centre |
NEM Network coordinator and researcher 2007/08 |
Approved |
$152,488.00 |
248 |
20/3/07 |
Total Environment Centre |
Employment of a NEM advocate and a project manager |
Approved |
$65,160.00 |
247 |
20/3/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Respond to AEMC Congestion Management Direction |
Rejected |
|
246 |
19/3/07 |
Alternative Technology Association |
Continue representation and advocacy for renewable energy micro-generation in the NEM |
Approved |
$46,726.00 |
245 |
19/3/07 |
Tasmanian Council of Social Service |
Electricity consumer research and advocacy 2007/2008 |
Approved |
$34,378.00 |
244 |
6/3/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Respond to Reliability Panel's March 2007 report |
Approved |
$18,144.00 |
243 |
26/2/07 |
Energy Users Association of Australia |
WACC Parameters Rule change |
Approved |
$34,000.00 |
242 |
26/2/07 |
Energy Users Association of Australia |
Revenue determination for SPAusNet 2008/2013 |
Rejected |
|
241 |
22/2/07 |
Energy Users Association of Australia |
Respond on the proposed swap of generation assets between AGL Energy and TRU energy |
Approved |
$8,000.00 |
240 |
24/1/07 |
Energy Users Association of Australia |
Additional funding for project 168 |
Approved |
$5,000.00 |
239 |
31/1/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
VENCorp/Powernet revenue reset review 2007 |
Approved |
$39.840.00 |
238 |
1/2/07 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Review of AER guidelines for electricity transmission revenue reset |
Approved |
$31,280.00 |
237 |
25/1/07 |
Energy Users Association of Australia |
Amendments to the National Electricity Law |
Approved |
$15,500.00 |
236 |
12/1/07 |
Consumer Action Law Centre |
Travel costs for attendance at the MCE's Retail Policy Working Group Stakeholder Reference Group meetings |
Rejected but funding approved under project 207 |
|
235 |
19/12/06 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Respond to EMR Bulletin 76 Retail Policy Working Group Working Paper No 2 |
Approved |
$18,360.00 |
234 |
20/1/07 |
University of Ballarat, School of Science and Engineering |
Empowering Rural Energy Consumers through Embedded Renewable Energy: Improving electricity market outcomes through addressing the impediments and opportunities associated with embedded renewable energy generation in central and western Victoria |
Withdrawn |
|
233 |
27/11/06 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
COAG Energy Reform Implementation Group - respond to discussion paper |
Approved |
$20,520.00 |
232 |
27/11/06 |
Energy Users Association of Australia |
COAG Energy Reform Implementation Group - respond to discussion paper |
Approved |
$39,900.00 |
231 |
14/11/06 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Respond to MCE Bulletin 71 re 2006 legislative package |
Approved |
$20,400.00 |
230 |
14/11/06 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Respond to AER on development of regulations for the economic regulation of transmission services |
Rejected |
|
229 |
14/11/06 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
COAG Energy Reform Implementation Group review of the energy market - respond to November 2006 draft report |
Rejected |
|
228 |
14/11/06 |
University of Ballarat, School of Science and Engineering |
Empowering Rural Energy Consumers through Embedded Renewable Energy: Addressing the social and behavioural impediments and opportunities associated with embedded renewable energy generation in central and western Victoria |
Rejected |
|
227 |
21/9/06 |
Energy Users Association of Australia |
Transgrid - development of supply to the Newcastle-Wollongong area |
Rejected |
|
226 |
21/9/06 |
Energy Users Association of Australia |
Amendments to the National Electricity Law, Regulations and Rules |
Rejected |
|
225 |
21/9/06 |
Energy Users Association of Australia |
COAG Energy Reform Implementation Group review of the energy market - assistance with further submissions |
Rejected |
|
224 |
21/9/06 |
Energy Users Association of Australia |
Funding of NEM specialist staff position |
Approved |
$87,711.00 |
223 |
14/9/06 |
Alternative Technology Association |
Continued representation and advocacy for small-scale renewable energy in the NEM |
Approved |
$22,464.00 |
222 |
9/8/06 |
South Australian Council of Social Service |
Employ NEM policy officer/advocate |
Approved |
$41,500.00 |
221 |
3/8/06 |
Consumer Action Law Centre |
Harmonisation of retail codes in the NEM |
Approved |
$10,000.00 |
220 |
1/8/06 |
Consumer Utilities Advocacy Centre |
Master classes for consumer advocacy organisations |
Approved |
$12,000.00 |
219 |
31/7/06 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Submission to Reliability Panel on reliability options and forward capacity markets |
Rejected |
|
218 |
25/7/06 |
Consumer Action Law Centre |
NEM Network coordinator and researcher |
Approved |
$30,660.00 |
217 |
24/7/06 |
Victorian Farmers Federation |
Energy services for intensive agricultural enterprises |
Rejected |
|
216 |
20/7/06 |
Alternative Technology Association |
Participate in "Fundamentals of the Australian Competitive Electricity Industry" training course |
Rejected |
|
215 |
10/7/06 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Submission to Energy Reform Implementation Group issues paper of July 2006 |
Approved |
$23,462.70 |
214 |
10/7/06 |
Energy Users Association of Australia |
Submission to Energy Reform Implementation Group issues paper of July 2006 |
Approved |
$23,952.00 |
213
|
30/6/06 |
Griffith University Centre for Credit and Consumer Law |
Implementation of FRC for electricity in Queensland |
Approved |
$50,165.00 |
212 |
15/5/06 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Develop response to the AEMC Draft Rule on transmission revenue and attend conference |
Approved |
$26,800.00 |
211 |
16/5/06 |
Tasmanian Council of Social Service |
Continuation of funding for electricity consumer research and advocacy project |
Approved |
$33,055.00 |
210 |
22/5/06 |
Griffith University Centre for Credit and Consumer Law |
Continuation of funding to build research and advocacy capacity |
Approved |
$121,170.00 |
209 |
23/5/06 |
Consumer Utilities Advocacy Centre |
NEM capacity building - master classes for consumer advocacy organisations |
Deferred |
|
208 |
23/5/06 |
Consumer Law Centre Victoria |
NEM consumer protection advocacy kit |
Approved |
$18,000.00 |
207 |
23/5/06 |
Consumer Law Centre Victoria |
NEM Network capacity building project |
Approved |
$87,376.85 |
206 |
23/5/06 |
Public Interest Advocacy Centre |
Participate in the CUAC Rural Energy Consumers Forum |
Approved |
$2,860.00 |
205 |
23/5/06 |
Energy Users Association of Australia |
Respond to MCE decision to transfer economic regulation of distribution to the AER and AEMC |
Rejected |
|
204 |
23/5/06 |
Energy Users Association of Australia and Energy Action Group |
Review MCE legislative and Rule amendments on end user advocacy |
Rejected |
|
203 |
23/5/06 |
Energy Users Association of Australia and Energy Action Group |
Impact of Snowy Hydro bidding and other market conduct |
Rejected |
|
202 |
23/5/06 |
Energy Users Association of Australia |
Respond to AEMC imminent draft report on congestion management |
Approved |
$22,100.00 |
201 |
23/5/06 |
Energy Users Association of Australia |
Review of end user implications of Queensland Government energy reforms |
Rejected |
|
200 |
23/5/06 |
Energy Users Association of Australia and Energy Action Group |
Respond to Reliability Panel May 2006 Comprehensive Reliability Review paper |
Rejected |
|
199 |
23/5/06 |
Energy Users Association of Australia |
Input into the MCE Demand Side Response Effectiveness Review |
Rejected |
|
198 |
23/5/06 |
Energy Users Association of Australia and Energy Action Group |
Amendment to the National Electricity Law Regulations & Rules |
Rejected |
|
197 |
23/5/06 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
Respond to Reliability Panel May 2006 Comprehensive Reliability Review paper |
Approved |
$50,000.00 |
196 |
23/5/06 |
Major Energy Users Inc (EMRF, ECCSA, EUCV & MEG Tasmania) |
AEMC transmission pricing and revenue review - participate in 2006 pricing review process |
Approved |
$83,680.00 |
195 |
23/5/06 |
Total Environment Centre |
Fund NEM advocate and a project manager |
Approved |
$111,653.00 |
194 |
31/3/06 |
City of Greater Bendigo |
Transmission equalisation adjustment type scheme retention strategy |
Approved |
$75,000.00 |
193 |
28/3/06 |
Alternative Technology Association |
Continued funding for representation and advocacy for small-scale renewable energy in the NEM |
Approved |
$24,064.00 |
192 |
21/3/06 |
Australian Council of Social Service |
Attend course on “Fundamentals of the Australian Competitive Electricity Industry” |
Approved |
$2,900.00 |
191 |
20/3/06 |
Consumer Utilities Advocacy Centre and Public Interest Advocacy Centre |
Workshop on AEMC Review of the electricity transmission revenue and pricing rules: identifying the issues and impacts on small end-users |
Approved |
$4,191.64 |
190 |
02/3/06 |
Energy Users Association of Australia |
Respond to National Electricity Amendment (Economic Regulation of Transmission Services) Rule 2006 |
Approved |
$25,000.00 |
189 |
20/2/06 |
Energy Market Reform Forum, Energy Consumers Coalition of South Australia, Energy Users Coalition of Victoria and Major Employers Group Tasmania |
Develop response to the AEMC Draft Rule on transmission revenue and attend conference |
Deferred |
|
188 |
20/2/06 |
Energy Users Coalition of Victoria and Electricity Consumers Coalition of South Australia |
Fund attendance of D Headberry as a member of the AEMC's Transmission Prescribed Services and Negotiated Transmission Services Working Group |
Approved |
$1,600.00 |
187 |
30/1/06 |
Consumer Law Centre Victoria |
Continue NEM project through network coordination, communication and conferences |
Approved |
$42,353.00 |
186 |
30//1/06 |
Energy Action Group |
Respond to Reliability Panel review of reliability criteria |
Deferred |
|
185 |
31/1/06 |
Energy Action Group |
Respond to AER on revenue determinations for transmission network, especially Powerlink |
Rejected |
|
184 |
30/1/06 |
Total Environment Centre |
Develop issues paper on jurisdictional directions |
Approved |
$37,500.00 |
183 |
31/1/06 |
Energy Action Group |
Respond to AEMC on enforcement and compliance with technical standards under the NER |
Rejected |
|
182 |
30/1/06 |
M Grenning & J Wellsmore |
Provide technical and economic advice to end-user representatives on Reliability Panel |
Withdrawn |
|
181 |
30/1/06 |
Energy Users Association of Australia |
Proposal to retain consultants for NEM based advocacy work |
Deferred |
|
180 |
30/1/06 |
Energy Users Association of Australia |
MCE gas market development & ACCC authorisation of PNG gas |
Rejected |
|
179 |
30/1/06 |
Energy Users Association of Australia |
Assessment of the performance of reserve capacity in the NEM over summer 2006 |
Deferred |
|
178 |
30/1/06 |
Energy Users Association of Australia and Energy Action Group |
Review of end-user implications of proposed sale of Snowy Hydro scheme |
Rejected |
|
177 |
30/1/06 |
Energy Users Association of Australia |
Network service and connection agreements in Queensland |
Approved |
$52,500.00 |
176 |
30/1/06 |
Energy Users Association of Australia and Energy Action Group |
Undertake advocacy on MCE SCO review of decision making by AER |
Approved |
$8,500.00 |
175 |
30/1/06 |
Energy Users Association of Australia |
Respond to AEMC on Rules change to last resort planner powers |
Deferred |
|
174 |
30/1/06 |
Energy Users Association of Australia and Energy Action Group |
Respond to AEMC on Advocacy Panel Rule change |
Deferred |
|
173 |
26/1/06 |
Major Energy Users Inc representing Energy Markets Reform Forum, Electricity Consumers Coalition of South Australia, and Energy Users Coalition of Victoria |
Respond to AEMC Issue Paper on enforcement & compliance with technical standards under the NER |
Rejected |
|
172 |
18/1/06 |
Major Energy Users Inc representing Energy Market Reform Forum, Energy Consumers Coalition of South Australia, Energy Users Coalition of Victoria and Major Employers Group Tasmania |
Respond to AER paper on pass through and revenue cap re-opening |
Approved |
$14,000.00 |
171 |
18/1/06 |
Major Energy Users Inc representing Energy Markets Reform Forum, Electricity Consumers Coalition of South Australia, and Energy Users Coalition of Victoria |
Respond to AEMC on proposed Rule changes for advocacy, regulatory test, regional boundaries and Snowy regional boundary |
Rejected |
|
170 |
15/1/06 |
Major Energy Users Inc representing Energy Market Reform Forum, Energy Consumers Coalition of South Australia, Energy Users Coalition of Victoria and Major Employers Group Tasmania |
Continue involvement in AEMC electricity transmission revenue and pricing review |
Rejected |
|
169 |
18/11/05 |
Energy Users Association of Australia |
Tasmania's entry to the NEM and capacity building among business users in Tasmania |
Rejected |
|
168 |
17/11/05 |
Energy Users Association of Australia |
Powerlink revenue determination by AER |
Approved |
$65,520.00 |
167 |
17/11/05 |
Energy Users Association of Australia |
Submission to AEMC on its review of the regulatory test principles |
Approved |
$38,500.00 |
166 |
16/11/05 |
Queensland Consumers Association |
Research consumer issues involved in FRC in the Queensland electricity market |
Approved |
$10,709.00 |
165 |
16/11/05 |
Energy Markets Reform Forum, Energy Users Coalition of Victoria and Energy Consumers Coalition of South Australia |
Respond to AEMC issues paper on transmission pricing |
Approved |
$21,120.00 |
164 |
15/11/05 |
Centre for Credit and Consumer Law |
Capacity building for the panel-funded advocate through attendance at energy conference |
Approved |
$3,295.00 |
163 |
15/11/05 |
Total Environment Centre |
Environmental interface project |
Withdrawn |
|
162 |
14/11/05 |
Major Energy Users Inc |
Funding of NEM specialist for three years |
Withdrawn |
|
161 |
2/11/05 |
Energy Markets Reform Forum, Energy Users Coalition of Victoria and Energy Consumers Coalition of South Australia |
Respond to AEMC transmission revenue paper issued October 2005 |
Approved |
$21,120.00 |
160 |
28/10/05 |
Energy Users Association of Australia |
Prospects of an appeal against ESCoV Final determination |
Approved |
$7,000.00 |
159 |
27/10/05 |
Energy Markets Reform Forum, Energy Users Coalition of Victoria and Energy Consumers Coalition of South Australia |
Review of decision-making in the gas and electricity regulatory frameworks |
Approved |
$14,500.00 |
158 |
19/10/05 |
Energy Action Group |
Respond to SCO Issues Paper on development of a national framework for distribution and retailing regulation |
Cancelled |
|
157 |
22/9/05 |
Australian Business Council for Sustainable Energy |
Review potential for self generation in the NEM and barriers to it |
Rejected |
|
156 |
23/9/05 |
Energy Action Group |
Respond to AER regulatory accounting methodologies position paper, Sept 2005 |
Rejected |
|
155 |
23/9/05 |
Energy Action Group |
Respond to AEMC transmission revenue and pricing issues papers to be released October 2005 |
Cancelled |
|
154 |
23/9/05 |
Energy Action Group |
Participate in the ESCoV end-to-end customer transfer paper and FRC It system |
Rejected |
|
153 |
23/9/05 |
Energy Users Association of Australia |
Develop end-user performance indicators for the Snowy constrain pricing trial derogation |
Approved |
$27,125.00 |
152 |
23/9/05 |
Energy Users Association of Australia |
Work on network connection agreements and network service agreements with NSPs and end users |
Rejected |
|
151 |
23/9/05 |
Energy Users Association of Australia |
Assess the impact of network price and revenue determinations on end users |
Rejected |
|
150 |
23/9/05 |
Energy Users Association of Australia |
ESC distribution business pricing review appeal |
Rejected |
|
149 |
26/9/05 |
Energy Users Association of Australia |
Facilitating end user advocacy and capacity building |
Rejected |
|
148 |
19/9/05 |
Major Energy Consumers Pty Ltd |
Funding of NEM specialist for three years |
Rejected |
|
147 |
16/9/05 |
Energy Action Group |
Funding to cover administration and operation costs for two years |
Rejected |
|
146 |
8/9/05 |
Tasmanian Council of Social Service |
Research pre-payment meter use in Tasmania |
Approved |
$27,000.00 |
145 |
22/8/05 |
Energy Users Association of Australia |
Participate in NEMMCO Wind Energy Industry Reference Group |
Approved |
$19,000.00 |
144 |
8/8/05 |
Energy Action Group |
AEMC initial consultation - review of the electricity transmission revenue and pricing rules |
Approved |
$5,000.00 |
143 |
18/7/05 |
Energy Users Association of Australia |
Develop market framework and rules for DSR for residential and SME consumers |
Rejected |
|
142 |
18/7/05 |
Energy Users Association of Australia |
Develop market framework and rules for DSR for large consumers |
Rejected |
|
141 |
18/7/05 |
Aria Professional Services and Property Council of Aust |
Investigate barriers to DSM in high rise accommodation facilities |
Approved |
$52,640.00 |
140 |
14/7/05 |
Energy Users Association of Australia on behalf of EAG, EMRF, ECCSA and EUCV |
Advocacy on the Effect of Industry Structure on Generator Competition and End-User Prices in the NEM |
Approved |
$19,495.00 |
139 |
4/7/05 |
Trans Tasman Energy Group |
Review street lighting inclusion in Regulated Asset Base |
Rejected |
|
138 |
11/7/05 |
Energy Action Group |
Respond to MCE Issues Paper on national regulatory framework |
Rejected |
|
137 |
11/7/05 |
Energy Action Group |
Review NEM FRC IT system arrangements and costs |
Rejected |
|
136 |
7/7/05 |
Energy Action Group |
Fund Utilities Advocate newsletter |
Rejected
|
|
135 |
8/7/05 |
Energy Users Association of Australia |
Three projects from 2005/2006 work program - MCE transmission Policy Statement, MCE Market Development Program and AER Review of Energy Network Regulation |
Approved |
$50,000.00 |
134 |
8/7/05 |
Energy Users Association of Australia |
Demand Side Response to NEMMCO Reserve Trader Tender |
Approved |
$40,000.00 |
133 |
8/7/05 |
Australian Council of Social Service |
Fund NEM advocate for 12 months |
Approved |
$122,000.00 |
132 |
28/4/05 |
Electricity Consumers Coalition of South Australia |
Respond to ETSA appeal against ESCoSA final determination on price cap |
Rejected |
|
131 |
20/4/05 |
Energy Response Pty Ltd |
Investigate impediments, legal issues and develop of DSR market |
| |
130 |
20/4/05 |
Energy Action Group |
Investigate legality of levies |
|
|
129 |
20/4/05 |
Energy Users Association of Australia |
Electricity contract harmonisation project |
| |
128 |
20/4/05 |
Energy Users Association of Australia |
NEM Electricity Reliability Standard Review |
|
|
127 |
20/4/05 |
Alternative Technology Association |
full-time NEM advocate for 12 months |
| $37,730.00 |
126 |
20/4/05 |
Consumer Utilities Advocacy Centre and the Centre for Regulatory Studies |
Where is the consumer? The implications of legislative and regulatory reforms in the NEM for consumers |
| $62,571.00 |
125 |
20/5/05 |
Energy Action Group |
Investigate information technology costs for the market settlement and transfer system |
| |
124 |
20/4/05 |
Energy Action Group |
Seminar for advocacy organisations |
Rejected |
|
123 |
20/4/05 |
Total Environment Centre |
Full-time NEM advocate for 12 months |
| $54.000.00 |
122 |
20/4/05 |
Consumer Law Centre Victoria |
Consumer advocates seminar re options paper on national retail and distribution regulatory regime. |
Approved |
|
121 |
20/4/05 |
Public Interest Advocacy Centre |
Licence compliance and enforcement |
Approved |
$38,350.00 |
120 |
20/4/05 |
Consumer Utilities Advocacy Centre and the Shire of Campaspe |
An analysis of the effectiveness of the regulatory and policy mechanisms available to rural and regional communities to enhance or improve their electricity infrastructure |
Approved |
$55,000.00 |
119 |
20/4/05 |
Institute for Sustainable Futures (University of Technology, Sydney) |
Disadvantage in the NEM: Improving market participation by disadvantaged households |
Deferred |
|
118 |
|
Sustainable Focus Pty Ltd |
Research invariant users and their implications for pricing policy and demand |
Approved stage 1 |
$15,400.00 |
117 |
|
Energy Users Coalition of Victoria |
Respond to Essential Services Commission of Victoria Electricity Distribution Price Review 2006-2010 papers |
| $35,900.00 |
116 |
|
| Energy Users Association of Australia |
|
| Global grant for four projects - Barriers to demand side response (105), Evaluation of ESC’s Distribution Pricing Review Consultation Papers (107), MCE National Framework Distribution and Retail Regulation Options Paper (108), and A study to review energy efficiency (109) |
|
Approved |
$127,000.00 |
115 |
|
| South Australian Council of Social Service |
|
| Respond to MCE SCO consultation paper "Consumer Advocacy" |
|
Approved |
$5,000.00 |
114 |
|
| Energy Users Coalition of Victoria |
|
| Respond to Essential Services Commission of Victoria Electricity Distribution Price Review 2006-2010 Position Paper |
|
Approved |
$18,480.00 |
113 |
25/02/05 |
Alternative Technology Association |
Extension of funding for Application 36 |
Approved |
$6,000.00 |
112 |
|
| Energy Users Coalition of Victoria and Electricity Consumers Coalition of South Australia |
|
| Review of Victorian Cross Ownership Rules |
|
Approved |
$21,000.00 |
111 |
|
| Energy Markets Reform Forum, Electricity Consumers Coalition of South Australia, and Energy Users Coalition of Victoria |
|
| Review and respond to MCE Options Papers to be issued March 2005 |
|
Approved |
$35,000.00 |
110 |
|
| Energy Users Association of Australia |
|
| National Electricity Law Regulations and Memorandum of Understanding |
|
Cancelled |
|
109 |
|
| Energy Users Association of Australia |
|
| A study to review energy efficiency |
|
Withdrawn |
|
108 |
|
| Energy Users Association of Australia |
|
| MCE National Framework Distribution and Retail Regulation Options Paper |
|
Withdrawn |
|
107 |
|
| Energy Users Association of Australia |
|
| Evaluation of ESC’s Distribution Pricing Review Consultation Papers |
|
Withdrawn |
|
106 |
|
| Energy Users Association of Australia |
|
| Review of Victorian Cross Ownership Rules |
|
Approved |
$20,230.00 |
105 |
|
| Energy Users Association of Australia |
|
| Barriers to demand side response (DSR) |
|
Withdrawn |
|
104 |
|
|
| Submission to AGLE vs ESCoSA |
|
Deferred |
|
103 |
|
|
| Submission to the Productivity Commission draft Energy Efficiency Report and the MCE SCO Energy Efficiency work stream. |
|
Approved |
$12,000.00 |
102 |
15/02/05 |
|
| Changes to the NEL in relation to implementing Merits Review Rights |
|
Approved |
$18,500.00 |
101 |
4/01/05 |
Energy Users Coalition of Victoria |
Response to Essential Service Commission of Victoria (ESCoV)16 Dec Issues Paper relating to the Electricity Distribution Price Review 2006-10 |
Rejected |
|
100 |
21/12/04 |
Electricity Consumers Coalition of South Australia |
Market risk premium and equity beta |
Approved |
$6,000.00 |
99 |
|
Centre for Credit and Consumer Law |
Research Salary and Costs |
Approved |
$90,763.00 |
98 |
29/11/04 |
South Australian Council of Social Service |
Advocacy Coordinator |
Deferred |
|
97 |
29/11/04 |
South Australian Council of Social Service |
Scoping on Vulnerable Consumers and NEM |
Rejected |
|
96 |
1/12/04 |
Energy Users Association of Australia |
New National Electricity Law (NEL) and National Electricity Rules (NERs) |
Approved |
$32,000.00 |
95 |
26/11/04 |
Institute for Sustainable Futures, University of Technology, Sydney |
Utilities Social Justice and Sustainability |
Rejected |
|
94 |
30/11/04 |
Energy Users Association of Australia; Energy Action Group; Energy Markets Reform Forum; Electricity Consumers Coalition of South Australia; and Energy Users Coalition of Victoria |
The Effect of Industry Structure on Generator Competition and End-User Prices in the NEM |
Approved |
$47,625.00 |
93 |
30/11/04 |
Energy Users Association of Australia |
Recommendations for building stronger consumer advocacy in NEM. |
Approved |
$13,000.00 |
92 |
30/11/04 |
Energy Users Association of Australia |
Transgrid/EA – Revised CAPEX submission |
Approved |
$21,280.00 |
91 |
30/11/04 |
Energy Users Association of Australia |
Reliability standards submission |
Approved |
$25,500.00 |
90 |
30/11/04 |
Moreland Energy Foundation Ltd |
Community Empowerment #2 |
Withdrawn |
|
89 |
18/11/04 |
Energy Users Association of Australia |
Review the report by Charles River associates and perform modeling, as appropriate, to quantify consumer impacts. |
Rejected |
|
88 |
18/11/04 |
Energy Users Association of Australia |
Attending public forums and providing a submission to SCO on behalf of end users on regulating national framework. |
Rejected |
|
87 |
16/10/04 |
Retirement Villages Assn |
Submission on embedded networks |
Approved |
$8,000.00 |
86 |
11/10/04 |
Roam Consulting and Energy Solutions |
To attend forum and review Charles River Associates Report on Regional Boundaries for purpose of Consumers Implications. |
Pending |
$0.00 |
85 |
2/10/04 |
Total Environmental Centre and Alternative Technology Association |
Engagement of an expert to provide guidance and ensure preparation of response to National Framework for Electricity and Gas Distribution and Retail Regulation Issues Paper |
Approved |
$20,500.00 |
84 |
23/09/04 |
Greg Walsh |
Fees for being representative on NEMMCO participant advisory committee |
Approved but did not
proceed |
|
83 |
21/09/04 |
Energy Consumers Coalition of South Australia and Energy Users Coalition of Victoria |
Submission with particular comment is sought on the principles which underpin the design of the national gas market. |
Rejected |
|
82 |
17/09/04 |
A3P – Australian Plantation Products and Paper Industry Council - on behalf of the Energy Intensive Industries Alliance. |
Providing input to the Ministerial Council On Energy’s Market Reform Program. |
Approved |
$72,500.00 |
81 |
20/09/04 |
Consumer Law Centre of Victoria |
Further funding for continued consumer contributions to the development of NEM |
Approved |
$98,100.00 |
80 |
20/09/04 |
Tasmanian Council of Social Service |
Facilitation and coordination of Tasmanian consumers and advocates on issues related to the NEM. |
Approved |
$19,148.00 |
79 |
23/09/04 |
Energy Users Association of Australia, CEC |
Attending public forums and preparing submission |
Rejected |
|
78 |
20/09/04 |
Energy Users Association of Australia |
MCE Principles for Gas Market development |
Approved |
$5,000.00 |
77 |
16/09/04 |
Trans Tasman Energy for Retirement Village Assn |
Submission to NEMMCO code consultation process |
Rejected |
|
76 |
10/09/04 |
Energy Action Group |
Meeting of consumer representatives to discuss issues confronting NEM |
Approved |
$17,500.00 |
75 |
14/09/04 |
Energy Market Reform Forum, Electricity Consumers Coalition of South Australia and Energy Users Coalition of Victoria |
Funding Responses to MCE Bulletins 22 and 23. |
Approved |
$20,000.00 |
74 |
30/08/04 |
Trans Tasman Energy for Retirement Village Assn |
ESC/embedded networks |
Approved |
$5,250.00 |
73 |
31/08/04 |
Exigency Management |
Submission on distribution and retail regulation |
Deferred |
|
72 |
19/08/04 |
Exigency Management |
Retail contracts |
Rejected |
|
71 |
26/07/04 |
Commerce Queensland |
Electricity Market Course |
Approved |
$2,800.00 |
70 |
26/07/04 |
Commerce QLD and Energy Users Association of Australia |
Queensland distribution price review |
Approved |
$83,250.00 |
69 |
25/07/04 |
Energy Users Association of Australia |
NSW contracting out electricity trading |
Approved |
$45,265.45 |
68 |
16/07/04 |
Property Council of Australia, Uniting Care Wesley Adelaide (representing the South Australian Council of Social Services), and Business SA |
Augmentation Study |
Approved |
$67,692.00 |
67 |
16/06/04 |
South Australian Centre for Economic Studies |
Market risk premium study |
Approved |
$94,400.00 |
66 |
12/07/04 |
Total Environment Centre |
Amendment to NEL to recognise low-income consumers, greenhouse emissions, DSM and renewable energy |
Part approved & balance deferred |
$45,314.00 |
65 |
1/07/04 |
Public Interest Advocacy Centre |
Electricity Market Course |
Approved |
$2,800.00 |
64 |
22/06/04 |
Southwest Victorian Dairy Industry Project |
Improve the quality of electricity supply at various milk powder production plants |
Approved |
$18,000.00 |
63 |
19/05/04 |
Energy Users Coalition of Victoria |
Victorian distributor’s revenue cap. |
Rejected |
|
62 |
13/05/04 |
AusWEA |
Submission on wind generation and the Regulatory Test. |
Referred back to applicant |
|
61 |
13/05/04 |
Trans Tasman Energy Group |
Street lighting and other excluded service charging. |
Withdrawn |
|
60 |
6/05/04 |
Consumers’ Federation of Australia, Australian Consumers’ Association, Consumer Law Centre of Victoria, Public Interest Advocacy Centre, Consumer Utilities Advocacy Centre and the Centre for Credit and Consumer Law |
Research the best model for long-term, effective consumer advocacy in NEM |
Approved |
$28,182.00 |
59 |
5/05/04 |
Allen Consulting Group |
Advice to AP on opportunities for end users |
Rejected |
|
58 |
1/05/04 |
Energy Consumers Coalition of South Australia and Energy Users Coalition of Victoria |
Fund D. Headberry’s attendance on ACCC working group |
Approved
|
$1,200.00 |
57 |
5/05/04 |
AiGroup, Energy Action Group, Energy Users Association of Australia, The Victorian Employers' Chamber of Commerce and Industry and JA’S |
Submission to Victorian distribution review |
Approved |
$50,000.00 |
56 |
13/04/04 |
Commerce QLD |
Submission on NEM and NEC aspects of Somerville inquiry |
Approved |
$20,000.00 |
55 |
26/04/04 |
Trans Tasman Energy (Retirement Villages Assoc.) |
Seek modification of the derogation about meter reading for sub 160MWh customers so that some of it may be contestable |
Approved |
$5,610.00 |
54 |
19/03/04 |
Headberry Partners Pty Ltd |
Attend MCE Melbourne Forum and report to / make submission by ECCSA |
Approved
|
$2,000.00 |
53.13 |
26/03/04 |
ACT Council of Social Service |
Attend forum / Submission |
Approved |
$2,500.00 |
53.12 |
25/03/04 |
South Australian Council of Social Service |
Attend forum / Submission |
Approved |
$5,000.00 |
53.11 |
0/01/00 |
Public Interest Advocacy Centre / Council on the Ageing |
Attend forum / Submission |
Approved |
$2,295.45 |
53.10 |
26/03/04 |
Commerce QLD |
Attend forum / Submission |
Approved |
$5,000.00 |
53.9 |
26/03/04 |
Tasmanian Council of Social Service |
Attend forum / Submission |
Approved |
$5,000.00 |
53.8 |
26/03/04 |
Cook/Energy Solutions Australia |
Report on business and domestic consumer issues arising from the national transmission study |
Approved |
$2,000.00 |
53.7 |
23/03/04 |
Alan Moran (Institute of Public Affairs) |
Attend forum / Submission |
Rejected |
|
53.6 |
18/03/04 |
Distributed Power |
DM Roadmap |
Approved |
$4,768.20 |
53.5 |
25/03/04 |
Energy Action Group |
Submissions to MCE |
Approved |
$12,000.00 |
53.4 |
|
Lablack (Business SA) |
Attend forum/Submission |
Approved |
$4,785.00 |
53.3 |
19/03/04 |
Energy Consumers Coalition of South Australia, Energy Market Reform Forum and Energy Users Coalition of Victoria |
Attend forum/Submission |
Approved |
$5,000.00 |
53.2 |
26/03/04 |
John Tyreman |
Hold seminars on DM |
Rejected |
|
53.1 |
3/01/04 |
Jarrat/QLD Consumers Association |
Attend forum/Submission |
Approved |
$3,380.53 |
52 |
27/02/04 |
Total Environment Centre |
Position paper on NGO concerns and policy proposals for NEM, NEMMCO and NEC |
Approved |
$25,000.00 |
51 |
26/02/04 |
Distributed Power Pty Ltd |
Demand management workshops, and a roadmap for DM |
Rejected |
|
50 |
23/02/04 |
Energy Markets Reform Forum |
Further submissions to ACCC on Transgrid revenue application |
Approved |
$62,000.00 |
49 |
31/01/04 |
Australian Business Ltd, Australian Consumers Association, Energy Action Group, Energy Users Association of Australia, National Farmers Federation |
Further submissions to ACCC on Transgrid revenue application |
Approved |
$45,000.00 |
48 |
16/01/04 |
Trans Tasman Energy |
Retirement village embedded electricity networks |
Approved |
$53,800.00 |
47 |
|
V Muthuswamy, AustElec |
Simpler price structures for customers |
Rejected |
|
46 |
1/12/03 |
Consumer Law Centre ACT and ACTCOSS |
Response to price determination by Independent Competition and Regulatory Commission |
Approved |
$13,200.00 |
45 |
26/11/03 |
MEF |
DM organisational meeting for environmental, consumer and social groups |
Rejected |
|
44 |
17/11/03 |
Australian Business Ltd, Australian Consumers Assn, EAG, EUAA, National Farmers Federation |
Submissions to ACCC on Transgrid and EA revenue applications |
Rejected |
|
43 |
26/11/03 |
EAG |
Salary for EAG personnel |
Rejected |
|
42 |
27/11/03 |
ACT Council for Social Service (ACTCOSS) |
Training domestic customers |
Approved |
$24,000.00 |
41 |
23/11/03 |
Moreland Energy Foundation (MEF) |
Improving Demand Management Choices for Small Customers |
Approved |
$83,700.00 |
40 |
28/11/03 |
SACOSS |
NEM training |
Approved |
$41,684.00 |
39 |
23/11/03 |
Energy Response Pty Ltd |
Commercial pilot of demand aggregation project |
Rejected |
|
38 |
9/10/03 |
Energy Markets Reform Forum |
Business end user submission to ACCC review of Transgrid and Energy Australia revenue cap |
Approved |
$14,000.00 |
37 |
2/10/03 |
Centre for Credit and Consumer Law, Griffith University, QLD |
Consultation with consumer organisations for submission to ACCC review of statement of Regulatory Principles for Transmission |
Approved |
$11,770.00 |
36 |
23/9/03 |
Alternative Technology Association |
Reducing impediments to renewable embedded generators |
Approved |
$48,080.00 |
35 |
22/10/03 |
Tasmanian Council for Social Service |
Capacity building – train domestic customers in NEM |
Approved |
$20,000.00 |
34 |
26/9/03 |
Business South Australia |
Study of South Australia business customer understanding of NEM |
Withdrawn |
|
33 |
31/7/03
|
Electricity Consumers Coalition of South Australia and Energy Users Coalition of Victoria |
Research into the impact of volatility on electricity prices within the community |
Rejected |
|
32 |
19/9/03 |
EUAA and EAG |
Additional submissions to IPART NSW distribution price review |
Approved |
$30,000.00 |
31 |
19/9/03 |
EUAA and Energy Action Group (EAG) |
Submission to ACCC review of ‘Statement of Regulatory Principles for Transmission’ |
Approved |
$20,000.00 |
30 |
19/9/03 |
Energy Users Association of Australia (EUAA), Australian Business Council for Sustainable Energy and Energy Action Group |
Conference to plan future demand side advocacy |
Approved |
$6,500.00 |
29 |
19/9/03 |
Energy Users Association of Australia |
Submission to Reliability Panel review of VOLL |
Approved |
$26,250.00 |
28 |
11/9/03 |
SA Centre for Economic Studies |
Analysis of discussion paper by ESCOSA on ‘Return on Assets’ for a submission by domestic consumer groups to the ESCOSA price review. |
Approved |
$15,875.00 |
27 |
29/8/03 |
Electricity Consumers Coalition of South Australia |
Submission to ESCOSA electricity distribution price review |
Approved |
$58,240.00 |
26 |
28/8/03 |
Power Down Under |
Objection to Milmerran-Middle Ridge transmission line of Powerlink ; whether ‘regulatory test’ correctly applied |
Approved |
$0.00 |
25 |
19/8/03 |
Energy Users Association of Australia |
Employment of a national electricity market specialist by EUAA |
Approved |
$398,904.00 |
24 |
18/8/03 |
Energy Users Association of Australia, Australian Business Council for Sustainable Energy and Energy Action Group |
Conference to plan future demand side advocacy |
Rejected |
|
23 |
17/8/03 |
Energy Users Association of Australia |
Capacity building for EUAA in Queensland |
Rejected |
|
22 |
8/8/03 |
Energy Users Association of Australia and Energy Markets Review Forum |
Study of Market Power in the NEM |
Rejected |
|
21 |
19/8/03 |
Energy Action Group |
Submissions to SA electricity distribution price review |
Rejected |
|
20 |
11/8/03 |
Energy Action Group |
NEM Library information project |
Rejected |
|
19 |
11/8/03 |
Energy Action Group |
12 months salary for Vice President to engage in end user advocacy projects |
Withdrawn |
|
18 |
11/8/03
|
Total Environment Centre |
DSM study in particular, transmission network augmentation in Sydney CBD and certain Victorian tendering processes on the DSM |
Approved |
$41,800.00 |
17 |
8/8/03 |
Western Research Institute |
Review of consumer participation in NEM in rural and regional Australia. |
Withdrawn |
|
16 |
7/8/03 |
Moreland Energy Foundation |
Demand management for small consumers |
Withdrawn |
|
15 |
6/8/03 |
Consumer Law Centre Victoria and Monash University Centre for the Study of Privatisation and Public Accountability |
Whether NEM has improved electricity services, lowered electricity prices and given greater access for electricity consumers and “improved public accountability” |
Rejected |
|
14 |
6/8/03 |
Consumer Consultative Committee of the ACCC |
Harmonisation of retail codes in the NEM |
Approved |
$48,352.00 |
13 |
8/8/03 |
Energy Users Association of Australia/ Energy Action Group |
Advocacy to IPART on its 2004 electricity network review |
Approved |
$50,000.00 |
12 |
6/8/03 |
Electricity Consumers Coalition of South Australia and Energy Users Coalition of Victoria |
Assessing impact of price volatility on end-user customers in the NEM |
Rejected |
|
11 |
30/7/03 |
Institute of Public Affairs |
Examination of the policy approaches for transmission under the Victorian gas arrangements and the national electricity market (similar to no.8) |
Rejected |
|
10 |
16/7/03 |
Exigency Management Pty Ltd |
Investigation of connection and network price information to assist planning by business users |
Approved |
$50,329.00 |
9 |
27/5/03 |
South Australian Council of Social Service |
Research and advocacy on the impact of the national electricity market and retail contestability on low income domestic electricity consumers |
Rejected |
|
8 |
9/5/03 |
Institute of Public Affairs |
Examination of policy approaches for transmission under the Victorian gas arrangements and the national electricity market |
Rejected |
|
7 |
17/5/03 |
Sustainability Centre Pty Ltd |
Production of information paper and articles for lay persons about the national electricity market and National Electricity |
Rejected |
|
6 |
24/4/03 |
Headberry Partners Pty Ltd |
Study to assess the levels of market risk premium and beta appropriate for regulated electricity businesses |
Approved |
$41,600.00 |
5 |
23/4/03 |
Headberry Partners Pty Ltd |
Proposal for funding PhD research study of electricity price volatility |
Rejected |
|
4 |
5/5/03 |
Consumer Law Centre Victoria |
Capacity building in the consumer sector |
Approved |
$130,000.00 |
3 |
14/4/03 |
Bob Lim & Co. Pty Ltd |
Review of “Regulatory Risk” in relation to electricity transmission businesses |
Approved |
$13,000.00 |
2 |
8/4/03 |
Energy Users Association of Australia/Energy Action Group |
Submission on Transend revenue application to ACCC |
Approved |
$30,318.00 |
1 |
8/4/03 |
Energy Users Association Of Australia/Energy Action Group |
Submission of ACCC review of Regulatory Test |
Approved |
$28,000.00 |
|
|
|
|
|
|
|
|
|
|
|
|